Home › Blog › Supplier Document Checklist: 9 Papers to Demand

Supplier Document Checklist: 9 Papers a Chinese Factory Should Send

Quick Answer: Between your first RFQ and the container arriving you should collect nine documents, and a factory will send only two without being asked: a quotation that names its Incoterm, and a proforma invoice. The other seven — specification sheet, fitment confirmation, IATF 16949 certificate with its scope, destination compliance pack, pre-shipment QC record, packing list with commercial invoice, and the bill of lading with the Chinese export declaration — exist in every factory that actually makes the product. They are simply not volunteered. A supplier that answers a document request with a proforma invoice and nothing else is not proof of fraud; it is proof that none of its previous buyers ever asked, which means nobody has tested the paperwork you are about to depend on.

Most sourcing guides stop at comparing quotations. The folder that arrives with the goods is where first-time importers lose money.

1. Why a proforma invoice is not a document trail

A proforma invoice is a payment request. It proves someone would like money, not that a factory exists, that a specification was agreed, or that the goods will be declared correctly.

A trading company's PI and a factory's PI look identical. What separates them sits underneath: a specification sheet with thicknesses, a QC record, a certificate whose scope you can look up.

3. What the Incoterm changes about who sends what

The term decides who books and who clears.

Term Export declaration (China) Freight Import clearance You hold
EXW Chinese side Buyer Buyer's forwarder Export declaration
FOB Chinese side Buyer Buyer's forwarder B/L, declaration
DAP Chinese side Seller Buyer Delivery document
DDP Chinese side Seller Seller Proof of duty paid

We never quote CIF, and quote EXW only where our clearance network does not reach: Brazil, Mexico, Israel, Iraq, Iran, India, Indonesia. Buying into one means owning freight and clearance.

4. The pattern behind the checklist

A factory that can produce them has a filing system, a QC process and a compliance history — the cheapest audit you will ever run. Red flags: a PI with no HS code, a certificate with no scope, a packing list issued after the container sailed.

Sources & References

  • Trigallop fact-ledger, 2026-11-05 — trade terms (EXW/FOB/DAP/DDP, no CIF), EXW-only destinations, HS 8708295900, 20HQ ≈ 25 canopies (internal, A-level).
  • IATF Global Oversight sanctioned interpretations, per Iglom (8 July 2026) and LRQA — aftermarket activities inside scope from 1 January 2028; verify via the IATF database (B-level).
  • Case Tools, canopy compliance guidance (2025-11-27; 2026-06-03) — ADR 42/04 and 58/01, AS/NZS 1235:2024, the statement / test-report / state-plate trio, five QC checkpoints (B-level).

Related reading: how to ship a canopy from China · the questions to ask a canopy factory · become a Trigallop distributor.

Frequently Asked Questions

1. A quotation that names its Incoterm

What it is. A price per SKU plus the trade term: EXW, FOB, DAP or DDP.

When you should have it. In the first substantive reply, before you compare anything.

What breaks without it. A price with no Incoterm is a number, not an offer. Two suppliers quoting the same figure may mean different scopes. We quote EXW, FOB, DAP and DDP, never CIF.

2. A proforma invoice that carries the HS code

What it is. The payment document: line detail, quantity, Incoterm, payment terms and tariff code.

When you should have it. Before the deposit, not after.

What breaks without it. Your broker classifies from the description it is handed, and classification decides duty. We work from 8708295900 — six digits, vehicle body parts. The national line is your broker's call; a factory naming one for a country it never ships to is guessing.

3. A specification sheet and drawing

What it is. Material, thickness, unit weight, roof load rating, dimensions, package size.

When you should have it. Before deposit, and again against the production lot — 15–25 working days once it starts.

What breaks without it. Fitment and warranty disputes rest on this sheet. A 1.5 mm steel canopy weighs 120–150 kg and is rated to 150 kg on the roof; the 3.0 mm aluminium shell is rated to 500 kg. Without it, neither figure is yours.

4. A fitment confirmation for your vehicle

What it is. A statement that this canopy fits this make, model, year range, cab type and bed length.

When you should have it. Before production starts — samples start at one piece, so this is the cheapest moment to be wrong.

What breaks without it. A canopy built for the wrong bed is scrap with freight attached. Tonneau covers are quoted per bed size after fitment is confirmed, so confirmation sits upstream of price.

5. An IATF 16949 certificate, with its scope read out loud

What it is. The automotive quality certificate, plus the scope statement for the site and line.

When you should have it. During qualification, before you treat the factory as automotive-grade.

What breaks without it. You inherit a claim you cannot substantiate. Look the number up in the IATF database and check issuing body, scope and validity. The file can be edited; the database record cannot. Scope is where surprises live: sites doing OEM and aftermarket work must bring aftermarket activities inside scope from 1 January 2028; pure aftermarket plants may certify voluntarily.

6. A destination compliance pack

What it is. The market file. Australia: an ADR compliance statement (ADR 42/04 structure, ADR 58/01 rear vision), an AS/NZS 1235:2024 test report, and a state modification plate (VicRoads, TfNSW) where dimensions change. United States: a tonneau cover needs a General Certificate of Conformity, issued by the importer on the factory's test reports.

When you should have it. Before you list the product, not before the container ships.

What breaks without it. You cannot answer a customer or a regulator. A CE certificate is no substitute: it answers a European question.

7. A pre-shipment QC record for your lot

What it is. The inspection record: incoming material, weld inspection, water test, torque check, coating cross-hatch.

When you should have it. Before the balance payment and before the container is sealed.

What breaks without it. You buy an assurance instead of a record; otherwise the only evidence is a sentence in an email.

8. A packing list and a commercial invoice

What it is. Per-carton dimensions and weights, plus the invoice values customs will use.

When you should have it. The packing list before your forwarder books; the invoice at shipment.

What breaks without it. Freight is priced on weight and volume, so a lazy packing list produces a wrong quote. It also lets you sanity-check the load: a 20HQ takes roughly 25 canopies, so a packing list claiming 40 is a question. The invoice sets the customs value.

9. A bill of lading and the Chinese export declaration

What it is. The B/L is the transport document and, depending on issue, the title. The export declaration is the Chinese-side filing showing the goods were declared out.

When you should have it. The B/L after departure; the declaration copy with the shipping documents.

What breaks without it. No B/L means no release. We handle the Chinese export declaration on every term we quote, but under EXW and FOB import clearance is your forwarder's job, so that copy proves the goods left China.

What documents should a Chinese supplier send before I pay a deposit?

Four: a quotation naming its Incoterm, a proforma invoice carrying the HS code, a specification sheet with material and load figures, and a fitment confirmation. Add the IATF certificate if you are qualifying the factory.

Is a proforma invoice enough to start an order?

It is enough to send money, not enough to protect it. A PI records price, not specification, tariff code or fitment. If it is the only document in the folder, you agreed a price without agreeing what you bought.

How do I verify an IATF 16949 certificate?

Look the certificate number up in the IATF database and compare issuing body, scope, site and validity. Do that instead of reading the PDF: the PDF is a copy, the database is the record. A genuine certificate may still not cover your line.

Who handles export customs clearance from China?

We do, on every term we quote, which is why the export declaration copy travels with the shipping set. Import clearance is separate: under EXW and FOB it is your forwarder's job; only under DDP does it move to the seller.

Get Your Exact Fit & Factory-Direct Quote

Send your truck model and requirements — our team replies within 24 hours.

✓ 24-hour response✓ 28-month warranty✓ 7-day inspection✓ Scan-confirmed fit